Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0252 # 02 Y:2024 | 02 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $53,389 | $212,000 | n/a |
UU0253 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $26,630 | $43,200 | n/a |
UU0252 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,070 | $4,410 | n/a |
UU0253 # 05 Y:2024 | 05 | 2024 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $150 | $450 | n/a |
UU0252 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,880 | $5,500 | n/a |
UU0253 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,211 | $18,400 | n/a |
UU0253 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $717 | $2,200 | n/a |
UU0252 # 01 Y:2024 | 01 | 2024 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $19,754 | $108,000 | n/a |
UU0253 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,113 | $26,430 | n/a |
UU0248 # 06 Y:2024 | 06 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $940 | $3,000 | n/a |
UU0248 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,570 | $9,360 | n/a |
UU0248 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,740 | $1,270 | n/a |
UU0248 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,380 | $133,800 | n/a |
UU0248 # 03 Y:2024 | 03 | 2024 | USE AUTOMATIC FLOW CONTROL | $820 | $4,250 | n/a |
UU0248 # 04 Y:2024 | 04 | 2024 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $33,420 | $319,250 | n/a |
UU0248 # 01 Y:2024 | 01 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $980 | $2,600 | n/a |
UU0247 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $864 | $7,540 | n/a |
UU0247 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $1,060 | $1,950 | n/a |
UU0247 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,970 | $3,000 | n/a |
UU0247 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $200,000 | $717,040 | n/a |
UU0247 # 02 Y:2024 | 02 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,770 | $9,500 | n/a |
UU0250 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,753 | $5,720 | n/a |
UU0250 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,795 | $5,760 | n/a |
UU0250 # 03 Y:2024 | 03 | 2024 | BURN A LESS EXPENSIVE GRADE OF FUEL | $11,024 | $16,000 | n/a |
UU0250 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $42,332 | $60,420 | n/a |