IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0045 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,260 $220 Implemented
UW0044 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,619 $168,530 Implemented
UW0044 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $1,780 Implemented
UW0042 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,225 $81,585 Implemented
UW0037 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,711 $1,060 Implemented
UW0037 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $709 $0 Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
UW0041 # 01 Y:2010 01 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,098 $866 Implemented
UW0041 # 02 Y:2010 02 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $653 $1,306 Implemented
UW0041 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $521 $261 Implemented
UW0035 # 02 Y:2010 02 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $28,000 $77,000 Implemented
UW0035 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,058 $1 Implemented
UW0035 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,700 $2,000 Implemented
UW0034 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,639 $102,000 Implemented
UW0034 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,749 $115,000 Implemented
UW0034 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,077 $10,000 Implemented
UW0033 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $429 $0 Implemented
UW0032 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,782 $31,747 Implemented
UW0032 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,643 $10,000 Implemented
UW0032 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,065 $3,070 Implemented
UW0032 # 05 Y:2009 05 2009 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $297 $200 Implemented
UW0029 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,416 $120,000 Implemented
UW0029 # 02 Y:2009 02 2009 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $10,263 $17,000 Implemented
UW0029 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $3,269 $3,800 Implemented