IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0479 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $667 $1,020 Not Implemented
WI0478 # 01 Y:2004 01 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,920 $59,780 Not Implemented
WI0478 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,493 $1,500 Not Implemented
WI0478 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,930 $1,040 Implemented
WI0478 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,441 $0 Implemented
WI0478 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,285 $1,000 Not Implemented
WI0478 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $23,430 n/a
WI0478 # 07 Y:2004 07 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,125 $2,500 Not Implemented
WI0478 # 08 Y:2004 08 2004 INSTALL TIMERS AND/OR THERMOSTATS $2,183 $1,200 Implemented
WI0477 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,743 $0 Not Implemented
WI0477 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,524 $855 Not Implemented
WI0477 # 03 Y:2004 03 2004 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,765 $605 Not Implemented
WI0477 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,817 $433 Not Implemented
WI0477 # 05 Y:2004 05 2004 INSTALL TIMERS AND/OR THERMOSTATS $923 $0 Not Implemented
WI0477 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $938 $0 Implemented
WI0477 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $582 $0 Not Implemented
WI0476 # 01 Y:2004 01 2004 BURN WASTE OIL FOR HEAT $73,937 $36,000 Not Implemented
WI0476 # 02 Y:2004 02 2004 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,807 $21,000 Not Implemented
WI0476 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,856 $8,856 Not Implemented
WI0476 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $5,082 $2,944 Not Implemented
WI0476 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,557 $4,280 Implemented
WI0476 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,148 $0 Implemented
WI0476 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,141 $640 Implemented
WI0476 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $308 $776 Not Implemented
WI0475 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $97,164 $40,200 Not Implemented