IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,179

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0518 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,802 $1,630 Not Implemented
WI0518 # 05 Y:2006 05 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,862 $7,000 Not Implemented
WI0518 # 04 Y:2006 04 2006 INSTALL SET-BACK TIMERS $4,978 $1,400 Not Implemented
WI0518 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,873 $0 Implemented
WI0518 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,585 $11,000 Not Implemented
WI0518 # 01 Y:2006 01 2006 IMPROVE SPACE COMFORT CONDITIONING $39,412 $4,975 Implemented
WI0517 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,730 $5,500 Not Implemented
WI0517 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,872 $2,000 Not Implemented
WI0517 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,306 $500 Implemented
WI0517 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $9,970 $14,000 Not Implemented
WI0517 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,406 $37,744 Implemented
WI0517 # 02 Y:2006 02 2006 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $25,159 $4,500 Not Implemented
WI0517 # 01 Y:2006 01 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,918 $6,000 Not Implemented
WI0516 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $2,560 Implemented
WI0516 # 06 Y:2006 06 2006 INSTALL TIMERS AND/OR THERMOSTATS $1,556 $200 Not Implemented
WI0516 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,187 $325 Not Implemented
WI0516 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,311 $1,000 Implemented
WI0516 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,330 $1,600 Not Implemented
WI0516 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,265 $33,480 Implemented
WI0516 # 01 Y:2006 01 2006 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $987,800 $0 Not Implemented
WI0515 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $907 $0 Not Implemented
WI0515 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $0 Not Implemented
WI0515 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,038 $1,280 Implemented
WI0515 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
WI0515 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,857 $3,600 Not Implemented