Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,179
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0518 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,802 | $1,630 | Not Implemented |
WI0518 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,862 | $7,000 | Not Implemented |
WI0518 # 04 Y:2006 | 04 | 2006 | INSTALL SET-BACK TIMERS | $4,978 | $1,400 | Not Implemented |
WI0518 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,873 | $0 | Implemented |
WI0518 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,585 | $11,000 | Not Implemented |
WI0518 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $39,412 | $4,975 | Implemented |
WI0517 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,730 | $5,500 | Not Implemented |
WI0517 # 06 Y:2006 | 06 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,872 | $2,000 | Not Implemented |
WI0517 # 05 Y:2006 | 05 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,306 | $500 | Implemented |
WI0517 # 04 Y:2006 | 04 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $9,970 | $14,000 | Not Implemented |
WI0517 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,406 | $37,744 | Implemented |
WI0517 # 02 Y:2006 | 02 | 2006 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $25,159 | $4,500 | Not Implemented |
WI0517 # 01 Y:2006 | 01 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $27,918 | $6,000 | Not Implemented |
WI0516 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,352 | $2,560 | Implemented |
WI0516 # 06 Y:2006 | 06 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,556 | $200 | Not Implemented |
WI0516 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,187 | $325 | Not Implemented |
WI0516 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,311 | $1,000 | Implemented |
WI0516 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,330 | $1,600 | Not Implemented |
WI0516 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,265 | $33,480 | Implemented |
WI0516 # 01 Y:2006 | 01 | 2006 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $987,800 | $0 | Not Implemented |
WI0515 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $907 | $0 | Not Implemented |
WI0515 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $972 | $0 | Not Implemented |
WI0515 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,038 | $1,280 | Implemented |
WI0515 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,559 | $0 | Implemented |
WI0515 # 03 Y:2006 | 03 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,857 | $3,600 | Not Implemented |