IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0291 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,451 $10,000 Not Implemented
WI0291 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,429 $740 Not Implemented
WI0291 # 06 Y:1997 06 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $1,693 $0 Implemented
WI0291 # 07 Y:1997 07 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,852 $0 Not Implemented
WI0290 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $119,620 $15,000 Implemented
WI0290 # 02 Y:1997 02 1997 REDUCE VENTILATION AIR $10,493 $15,000 Not Implemented
WI0290 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,560 $5,000 Implemented
WI0290 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,200 $15,000 Not Implemented
WI0290 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,755 $330 Implemented
WI0290 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,526 $1,380 Not Implemented
WI0290 # 07 Y:1997 07 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,982 $0 Not Implemented
WI0290 # 08 Y:1997 08 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,333 $500 Implemented
WI0290 # 09 Y:1997 09 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,280 $1,120 Implemented
WI0290 # 10 Y:1997 10 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $784 $0 Not Implemented
WI0289 # 01 Y:1997 01 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,900 $0 Implemented
WI0289 # 02 Y:1997 02 1997 ADOPT IN-HOUSE MATERIAL GENERATION $12,690 $0 Implemented
WI0289 # 03 Y:1997 03 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,496 $11,150 Not Implemented
WI0289 # 04 Y:1997 04 1997 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $7,349 $22,000 Not Implemented
WI0289 # 05 Y:1997 05 1997 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $6,780 $34,425 Not Implemented
WI0289 # 06 Y:1997 06 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,430 $0 Implemented
WI0289 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,219 $150 Implemented
WI0289 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $640 Not Implemented
WI0289 # 09 Y:1997 09 1997 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,541 $5,000 Implemented
WI0288 # 01 Y:1997 01 1997 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $5,567 $500 Implemented
WI0288 # 02 Y:1997 02 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,058 $0 Implemented