IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,285

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0565 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $2,854 $533 Implemented
WV0565 # 05 Y:2018 05 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,441 $500 Implemented
WV0565 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $810 $1,600 Implemented
WV0565 # 07 Y:2018 07 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $733 $1,750 Not Implemented
WV0565 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $704 $40 Implemented
WV0563 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $85,272 $36,000 Not Implemented
WV0563 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,489 $54,000 Not Implemented
WV0563 # 03 Y:2018 03 2018 RECOVER WASTE HEAT FROM EQUIPMENT $35,888 $173,323 Not Implemented
WV0563 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $20,002 $754 Implemented
WV0563 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,206 $59,750 Not Implemented
WV0563 # 06 Y:2018 06 2018 MINIMIZE WATER USAGE $1,202 $1,400 Implemented
WV0563 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $264 $235 Implemented
WV0562 # 01 Y:2018 01 2018 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $284,971 $600,000 Not Implemented
WV0562 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $16,104 $80,009 Not Implemented
WV0562 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,359 $2,000 Implemented
WV0562 # 04 Y:2018 04 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,822 $0 Implemented
WV0562 # 05 Y:2018 05 2018 DEVELOP A REPAIR/REPLACE POLICY $6,713 $703 Implemented
WV0562 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $2,979 $1,328 Implemented
WV0562 # 07 Y:2018 07 2018 MINIMIZE WATER USAGE $543 $2,100 Implemented
WV0559 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $84,000 $3,000 Implemented
WV0559 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $45,746 $111,500 Not Implemented
WV0559 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $6,517 $3,640 Implemented
WV0559 # 04 Y:2018 04 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $4,668 $19,300 Implemented
WV0559 # 05 Y:2018 05 2018 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,560 $1,000 Implemented
WV0559 # 06 Y:2018 06 2018 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,563 $11,400 Not Implemented