IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,225

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0605 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,600 $1,326 Implemented
WV0605 # 09 Y:2021 09 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,833 $1,500 Implemented
WV0604 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $20,602 $23,284 Implemented
WV0604 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $18,040 $7,122 Implemented
WV0604 # 04 Y:2021 04 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,330 $1,500 Implemented
WV0604 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,431 $403 Implemented
WV0604 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,500 $1,792 Implemented
WV0604 # 07 Y:2021 07 2021 DEVELOP A REPAIR/REPLACE POLICY $1,749 $672 Implemented
WV0604 # 09 Y:2021 09 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,302 $4,100 Implemented
WV0604 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $733 $35 Implemented
WV0601 # 01 Y:2020 01 2020 USE EVAPORATION TO CONCENTRATE MATERIAL $24,050 $90,000 Implemented
WV0601 # 02 Y:2020 02 2020 RECOVER AND REUSE WASTE MATERIAL $15,085 $15,000 Implemented
WV0601 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,944 $3,000 Implemented
WV0601 # 04 Y:2020 04 2020 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $4,392 $6,660 Implemented
WV0601 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $2,885 $13,900 Implemented
WV0601 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,355 $1,691 Implemented
WV0601 # 07 Y:2020 07 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,303 $10,560 Implemented
WV0601 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $1,509 $2,170 Implemented
WV0601 # 09 Y:2020 09 2020 UPGRADE CONTROLS ON COMPRESSORS $514 $1,425 Implemented
WV0601 # 10 Y:2020 10 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $530 Implemented
WV0600 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $9,760 $21,875 Implemented
WV0600 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138 $750 Implemented
WV0599 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,634 $94,500 Implemented
WV0599 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $25,793 $83,200 Implemented
WV0599 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,379 $45,860 Implemented