IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0248 # 06 Y:2002 06 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,409 $13,000 Implemented
SF0246 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $166 Implemented
SF0246 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $3,180 Implemented
SF0245 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $4,115 Implemented
SF0245 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,585 $20,725 Implemented
SF0245 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,738 $6,972 Implemented
SF0245 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,193 $0 Implemented
SD0306 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,468 $0 Implemented
LM0045 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,903 $0 Implemented
LM0045 # 04 Y:2002 04 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $3,478 $5,500 Implemented
LM0045 # 05 Y:2002 05 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,050 $11,250 Implemented
SF0244 # 02 Y:2002 02 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $107,810 $50,000 Implemented
SF0244 # 04 Y:2002 04 2002 REDUCE FLUID FLOW RATES $31,494 $16,627 Implemented
SF0244 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,304 $4,110 Implemented
SF0244 # 07 Y:2002 07 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,274 $17,580 Implemented
SF0244 # 08 Y:2002 08 2002 REDUCE EXCESSIVE BOILER BLOWDOWN $6,671 $6,000 Implemented
SF0244 # 16 Y:2002 16 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $101,519 $350,000 Implemented
SF0243 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,347 $240 Implemented
SF0243 # 07 Y:2002 07 2002 REDUCE FLUID FLOW RATES $5,887 $5,671 Implemented
LM0044 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,025 $625 Implemented
LM0044 # 04 Y:2002 04 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $14,885 $0 Implemented
LM0044 # 05 Y:2002 05 2002 PURCHASE APPROPRIATELY SIZED MATERIAL $216,000 $3,400 Implemented
SF0242 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,642 $300 Implemented
SF0242 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,176 $572 Implemented
SF0242 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,518 $1,217 Implemented