IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,618

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0637 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $132 $150 Implemented
UD0637 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55 $12 Implemented
UD0636 # 01 Y:2002 01 2002 INCREASE USE OF AUTOMATION $62,400 $0 Implemented
UD0636 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $20,587 $7,200 Implemented
UD0636 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,230 $25,000 Implemented
UD0636 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $4,987 $3,750 Implemented
UD0636 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,247 $500 Implemented
UD0636 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,668 $1,185 Implemented
UD0636 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,509 $2,880 Implemented
UD0636 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,335 $420 Implemented
UD0636 # 09 Y:2002 09 2002 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,223 $0 Implemented
UD0636 # 10 Y:2002 10 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $736 $300 Implemented
UD0635 # 09 Y:2002 09 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $1,800 Implemented
UM0200 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,418 $2,000 Implemented
UM0200 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,869 $750 Implemented
UD0634 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,762 $400 Implemented
UD0634 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,372 $0 Implemented
UD0634 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,089 $132 Implemented
UD0634 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $600 Implemented
UD0633 # 01 Y:2001 01 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $25,095 $6,000 Implemented
UD0633 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,974 $3,000 Implemented
UD0633 # 05 Y:2001 05 2001 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,373 $600 Implemented
UD0633 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,150 $1,750 Implemented
UD0633 # 08 Y:2001 08 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,374 $0 Implemented
WV0226 # 01 Y:2001 01 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,373 $0 Implemented