IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,598

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0575 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $70 Implemented
WV0575 # 08 Y:2019 08 2019 DEVELOP A REPAIR/REPLACE POLICY $576 $558 Implemented
WV0574 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $14,108 $10,162 Implemented
WV0574 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,691 $46 Implemented
WV0574 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,235 $0 Implemented
WV0574 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $2,811 $540 Implemented
WV0574 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,169 $1,725 Implemented
UD0991 # 02 Y:2019 02 2019 USE POWER DURING OFF-PEAK PERIODS $15,085 $0 Implemented
WV0572 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,987 $1,000 Implemented
WV0572 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,205 $2,889 Implemented
WV0572 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $2,814 $587 Implemented
UD0995 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,443 $1,500 Implemented
UD0995 # 03 Y:2019 03 2019 REPAIR OR REPLACE STEAM TRAPS $5,974 $1,800 Implemented
UD0995 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $1,159 $3,500 Implemented
UD0995 # 07 Y:2019 07 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $5,847 $11,694 Implemented
UD0995 # 08 Y:2019 08 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $606 $0 Implemented
UD0995 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,887 $17,856 Implemented
UD0994 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $248,034 $337,264 Implemented
UD0993 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $2,531 $2,940 Implemented
UD0993 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,977 $9,300 Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
WV0566 # 02 Y:2018 02 2018 DEVELOP A REPAIR/REPLACE POLICY $4,621 $945 Implemented
WV0566 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,255 $600 Implemented
WV0566 # 04 Y:2018 04 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,029 $500 Implemented
WV0566 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,581 $575 Implemented