IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,325

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0838 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,070 $10,152 Implemented
AM0838 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,720 $29,570 Implemented
AM0838 # 05 Y:2022 05 2022 USE SYNTHETIC LUBRICANT $1,646 $300 Implemented
AM0838 # 06 Y:2022 06 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,835 $1,420 Implemented
AM0838 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,164 $0 Implemented
UF0571 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $72,351 $83,616 Implemented
UF0571 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $23,651 $18,000 Implemented
UF0571 # 03 Y:2022 03 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $22,414 $51,208 Implemented
UF0571 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $4,673 $5,569 Implemented
UF0571 # 05 Y:2022 05 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $65,277 $10,000 Implemented
UF0571 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $8,754 $0 Implemented
SF0579 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,525 $0 Implemented
SF0579 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $37,544 $0 Implemented
SF0579 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,201 $1,018 Implemented
SF0579 # 05 Y:2021 05 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,523 $11,498 Implemented
SF0579 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,583 $6,929 Implemented
SF0579 # 08 Y:2021 08 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,024 $2,236 Implemented
SF0579 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,144 $23,308 Implemented
SF0579 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,437 $13,019 Implemented
TT0263 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $88,815 Implemented
MI0399 # 02 Y:2021 02 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,060 $240,000 Implemented
MI0399 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,020 $320 Implemented
MI0399 # 04 Y:2021 04 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,245 $70,400 Implemented
MI0399 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,405 $1,670 Implemented
MI0399 # 07 Y:2021 07 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,286 $4,468 Implemented