IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0227 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $376 $0 Implemented
SD0227 # 05 Y:1999 05 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,990 $0 Implemented
SF0169 # 01 Y:1999 01 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,749 $1,874 Implemented
SF0169 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,009 $2,657 Implemented
SF0169 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,319 $2,085 Implemented
SF0169 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,535 $105,940 Implemented
SF0169 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $791 $2,991 Implemented
SF0169 # 09 Y:1999 09 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $7,080 $250 Implemented
SF0169 # 10 Y:1999 10 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $861 $250 Implemented
SF0169 # 11 Y:1999 11 1999 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $55,556 $17,250 Implemented
SD0226 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $4,040 Implemented
SD0226 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,129 $50 Implemented
SD0226 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,584 $400 Implemented
SD0226 # 06 Y:1999 06 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,751 $0 Implemented
SD0226 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $903 $0 Implemented
SD0226 # 09 Y:1999 09 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,618 $0 Implemented
SD0226 # 11 Y:1999 11 1999 MAINTAIN MACHINES TO REDUCE LEAKS $1,103 $385 Implemented
SF0168 # 01 Y:1999 01 1999 INSTALL TIMERS AND/OR THERMOSTATS $3,158 $1,318 Implemented
SF0168 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $547 $1,344 Implemented
SF0168 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $482 $1,433 Implemented
SD0225 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,757 $13,042 Implemented
SD0225 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,087 $0 Implemented
SD0225 # 04 Y:1999 04 1999 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $704 $400 Implemented
SD0225 # 05 Y:1999 05 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,845 $240 Implemented
SD0225 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,820 $0 Implemented