IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0455 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,695 $1,320 Implemented
UD0455 # 09 Y:1995 09 1995 USE "WASH-LESS" PROCESSING EQUIPMENT $41,020 $8,000 Implemented
UD0454 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $2,446 $6,000 Implemented
UD0454 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,922 $9,785 Implemented
UD0453 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,640 $0 Implemented
WV0056 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,678 $250 Implemented
WV0056 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,481 $1,482 Implemented
WV0056 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $2,144 $0 Implemented
WV0055 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,944 $1,558 Implemented
WV0055 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $655 $500 Implemented
WV0055 # 03 Y:1995 03 1995 RECOVER WASTE HEAT FROM EQUIPMENT $768 $374 Implemented
WV0055 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $589 $760 Implemented
WV0055 # 07 Y:1995 07 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,650 $3,780 Implemented
UD0452 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,950 $0 Implemented
UD0451 # 01 Y:1995 01 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $11,837 $2,000 Implemented
UD0451 # 02 Y:1995 02 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $17,100 $0 Implemented
UD0450 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,163 $0 Implemented
UD0450 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,096 $2,000 Implemented
UD0450 # 03 Y:1995 03 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,103 $2,000 Implemented
UD0450 # 07 Y:1995 07 1995 METER WASTE WATER $61,699 $2,000 Implemented
UD0449 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,945 $250 Implemented
UD0449 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,532 $0 Implemented
UD0449 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,439 $0 Implemented
UD0449 # 04 Y:1994 04 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,258 $0 Implemented
UD0449 # 05 Y:1994 05 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,815 $0 Implemented