IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,292

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0063 # 18 Y:2010 18 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $733 $615 Implemented
LE0300 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,838 $19,900 Implemented
LE0300 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,921 $2,440 Implemented
LE0300 # 05 Y:2010 05 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,417 $30,000 Implemented
LE0300 # 06 Y:2010 06 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,315 $3,000 Implemented
LE0300 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,827 $1,000 Implemented
LE0300 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $8,078 $900 Implemented
LE0300 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,263 $42,718 Implemented
DL0056 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $184,560 $1,200,000 Implemented
DL0056 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,000 $300 Implemented
DL0056 # 06 Y:2010 06 2010 USE OPTIMUM TEMPERATURE $7,644 $100 Implemented
DL0048 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,459 $100 Implemented
DL0048 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $6,420 $112 Implemented
DL0048 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,596 $0 Implemented
DL0042 # 01 Y:2009 01 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,756 $0 Implemented
DL0042 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $28,200 $1,760 Implemented
LE0289 # 01 Y:2009 01 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,778 $20,000 Implemented
LE0289 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,121 $304 Implemented
LE0289 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $2,824 Implemented
DL0039 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $4,047 $0 Implemented
DL0039 # 02 Y:2009 02 2009 USE "WASH-LESS" PROCESSING EQUIPMENT $4,000 $0 Implemented
LE0286 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,998 $192 Implemented
LE0286 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $350 Implemented
LE0286 # 08 Y:2009 08 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,174 $100 Implemented
LE0286 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,921 $25,494 Implemented