Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,631
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0545 # 03 Y:2017 | 03 | 2017 | INSTALL SET-BACK TIMERS | $4,904 | $1,700 | Implemented |
WV0545 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,500 | $4,023 | Implemented |
WV0545 # 08 Y:2017 | 08 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $516 | $568 | Implemented |
WV0545 # 10 Y:2017 | 10 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $268 | $20 | Implemented |
UD0967 # 02 Y:2017 | 02 | 2017 | OPERATE BOILERS ON HIGH FIRE SETTING | $5,894 | $27 | Implemented |
UD0967 # 03 Y:2017 | 03 | 2017 | REPAIR OR REPLACE STEAM TRAPS | $3,938 | $7,676 | Implemented |
UD0967 # 07 Y:2017 | 07 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $89,503 | $0 | Implemented |
UD0967 # 08 Y:2017 | 08 | 2017 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $32,400 | $4,662 | Implemented |
UD0967 # 14 Y:2017 | 14 | 2017 | MINIMIZE WATER USAGE | $13,765 | $6,000 | Implemented |
UD0967 # 17 Y:2017 | 17 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,764 | $0 | Implemented |
UD0966 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $383,642 | $613,600 | Implemented |
UD0965 # 03 Y:2017 | 03 | 2017 | USE AUTOMATIC CLEANING EQUIPMENT | $15,770 | $0 | Implemented |
UD0965 # 04 Y:2017 | 04 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,437 | $700 | Implemented |
UD0965 # 05 Y:2017 | 05 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $26,366 | $2,000 | Implemented |
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $300 | Implemented |
UD0965 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $1,230 | Implemented |
UD0963 # 02 Y:2017 | 02 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,232 | $400 | Implemented |
UD0963 # 03 Y:2017 | 03 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,139 | $0 | Implemented |
UD0962 # 02 Y:2017 | 02 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,791 | $211,700 | Implemented |
UD0962 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $7,630 | $8,990 | Implemented |
UD0962 # 10 Y:2017 | 10 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,104 | $1,000 | Implemented |
WV0537 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,952 | $7,891 | Implemented |
WV0537 # 04 Y:2017 | 04 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,934 | $1,200 | Implemented |