Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
627
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0102 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,430 | $4,040 | Implemented |
UU0102 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $23,250 | $8,290 | Implemented |
UU0098 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,060 | $0 | Implemented |
UU0098 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $2,100 | Implemented |
UU0098 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,690 | $1,000 | Implemented |
UU0098 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $410 | $2,880 | Implemented |
UU0098 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $2,380 | $2,040 | Implemented |
UU0089 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $1,110 | $4,290 | Implemented |
UU0089 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,700 | $2,000 | Implemented |
UU0095 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,360 | $2,000 | Implemented |
UU0090 # 01 Y:2005 | 01 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $11,500 | $225 | Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |
UU0078 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,970 | $400 | Implemented |
UU0078 # 08 Y:2004 | 08 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $810 | $450 | Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0075 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,590 | $1,320 | Implemented |
UU0075 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $150 | Implemented |
UU0075 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,270 | $1,000 | Implemented |
UU0074 # 06 Y:2004 | 06 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,570 | $12 | Implemented |
UU0071 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,645 | $2,000 | Implemented |
UU0071 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,294 | $0 | Implemented |
UU0071 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,655 | $3,894 | Implemented |
UU0071 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $400 | Implemented |