IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,206

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2413 # 01 Y:2024 01 2024 UPGRADE CONTROLS ON COMPRESSORS $68,225 $155,400 Implemented
LS2413 # 02 Y:2024 02 2024 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $5,076 $16,000 Implemented
MI0447 # 01 Y:2024 01 2024 UPGRADE OBSOLETE EQUIPMENT $636,028 $600,000 Implemented
MI0447 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,522 $700 Implemented
MI0447 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,899 $1,980 Implemented
MI0447 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $3,750 Implemented
MI0447 # 06 Y:2024 06 2024 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $792 $320 Implemented
UD1088 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,165 $953 Implemented
UD1088 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
IP0198 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $108 $0 Implemented
IP0198 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $564 $170 Implemented
IP0198 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $447 $356 Implemented
IP0198 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,639 $3,266 Implemented
UU0255 # 01 Y:2024 01 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $64,548 $8,000 Implemented
UU0255 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,674 $8,711 Implemented
UU0255 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,299 $2,614 Implemented
UU0255 # 04 Y:2024 04 2024 USE OPTIMUM THICKNESS INSULATION $10,948 $4,085 Implemented
UU0255 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,750 $4,964 Implemented
UU0255 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,033 $8,000 Implemented
UU0255 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,849 $4,680 Implemented
UU0255 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,932 $60,862 Implemented
IP0197 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $33,478 $697 Implemented
IP0197 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,000 $1,506 Implemented
IP0197 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,370 $13,000 Implemented
IP0197 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,867 $18,107 Implemented