IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,206

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0445 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $427,475 $602,500 Implemented
MI0445 # 03 Y:2024 03 2024 PAY UTILITY BILLS ON TIME $80,165 $0 Implemented
MI0445 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $46,588 $99,444 Implemented
MI0445 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,574 $11,027 Implemented
MI0445 # 06 Y:2024 06 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,584 $150 Implemented
MI0445 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,583 $5,793 Implemented
MI0445 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $3,269 $2,860 Implemented
AS0582 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $27,124 $186,339 Implemented
AS0582 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,181 $26,757 Implemented
AS0582 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,400 $204,000 Implemented
AS0582 # 05 Y:2024 05 2024 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $1,154 $80 Implemented
OK1116 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $38,052 $31,569 Implemented
OK1116 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $17,160 $7,800 Implemented
OK1116 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,536 $0 Implemented
TT0313 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,143 $60 Implemented
TT0313 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,255 $2,625 Implemented
TT0313 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,207 $340 Implemented
TT0313 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,724 $2,600 Implemented
TT0313 # 11 Y:2024 11 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $92,752 $120,000 Implemented
UD1087 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,335 $1,068 Implemented
UD1087 # 08 Y:2024 08 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $601 $2,093 Implemented
OR0791 # 01 Y:2024 01 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $29,053 $352,000 Implemented
OR0791 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,079 $5,750 Implemented
NT0029 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,179 $5,609 Implemented
NT0029 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,227 $1,819 Implemented