IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,292

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
HO0225 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $999 $1,969 Implemented
HO0216 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,650 $548 Implemented
HO0216 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $11,898 $5,000 Implemented
HO0216 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,645 $10,005 Implemented
HO0216 # 09 Y:2000 09 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,665 $222 Implemented
HO0209 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,005 $1,600 Implemented
HO0209 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,540 $570 Implemented
HO0205 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,560 $11,408 Implemented
HO0205 # 03 Y:1999 03 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,069 $0 Implemented
HO0205 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,757 $5,030 Implemented
HO0205 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,260 $24,000 Implemented
HO0193 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,758 $16,993 Implemented
HO0193 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $785 $1,000 Implemented
HO0193 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,524 $360 Implemented
HO0193 # 04 Y:1999 04 1999 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $395 $400 Implemented
HO0193 # 05 Y:1999 05 1999 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $825 $2,000 Implemented
HO0193 # 06 Y:1999 06 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $300 Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented
HO0192 # 05 Y:1999 05 1999 INSTALL REPLACEMENT DOORS $562 $700 Implemented
HO0192 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $960 $600 Implemented
HO0192 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,000 $1,000 Implemented