Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,681
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0364 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $38,687 | $109,552 | Implemented |
MI0364 # 02 Y:2019 | 02 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,750 | $35,446 | Implemented |
MI0364 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,252 | $23,997 | Implemented |
MI0364 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,631 | $3,600 | Implemented |
MI0364 # 05 Y:2019 | 05 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $5,164 | $16,940 | Implemented |
MI0363 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,089 | $74,297 | Implemented |
MI0363 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,037 | $3,600 | Implemented |
MI0363 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,025 | $120 | Implemented |
MI0363 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,145 | $1,980 | Implemented |
MI0363 # 08 Y:2019 | 08 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,001 | $240 | Implemented |
UF0542 # 01 Y:2019 | 01 | 2019 | RECOVER MECHANICAL ENERGY | $21,606 | $120,000 | Implemented |
UF0542 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,764 | $60,608 | Implemented |
UF0542 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,073 | $72,054 | Implemented |
MI0362 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,441 | $3,600 | Implemented |
MI0362 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,814 | $1,980 | Implemented |
MI0362 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,481 | $185 | Implemented |
MI0362 # 08 Y:2019 | 08 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,148 | $1,126 | Implemented |
MI0362 # 09 Y:2019 | 09 | 2019 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,147 | $1,090 | Implemented |
MI0362 # 10 Y:2019 | 10 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $288 | $187 | Implemented |
MI0361 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,647 | $100,030 | Implemented |
MI0361 # 03 Y:2019 | 03 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,548 | $3,600 | Implemented |
MI0361 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,278 | $17,214 | Implemented |
MI0361 # 06 Y:2019 | 06 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,612 | $160 | Implemented |
MI0361 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,145 | $1,980 | Implemented |
UF0541 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $365,719 | $1,800,000 | Implemented |