IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,075

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0058 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,034 $0 Implemented
TT0058 # 04 Y:2010 04 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $584 $850 Implemented
TT0055 # 02 Y:2010 02 2010 OPTIMIZE PLANT POWER FACTOR $11,430 $13,000 Implemented
TT0055 # 03 Y:2010 03 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $560 $825 Implemented
TT0055 # 05 Y:2010 05 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $520 $15 Implemented
TT0055 # 06 Y:2010 06 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $253 $250 Implemented
TT0055 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,024 $40 Implemented
TT0054 # 01 Y:2010 01 2010 REDUCE VENTILATION AIR $204,750 $50,000 Implemented
TT0054 # 02 Y:2010 02 2010 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $23,040 $10,000 Implemented
TT0054 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $18,350 $20,000 Implemented
TT0054 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $4,500 Implemented
TT0054 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,240 $4,000 Implemented
TT0054 # 06 Y:2010 06 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $410 $50 Implemented
TT0049 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,756 $173,505 Implemented
TT0050 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $40,479 $4,300 Implemented
TT0050 # 04 Y:2010 04 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,900 $500 Implemented
TT0050 # 05 Y:2010 05 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,200 $0 Implemented
TT0048 # 01 Y:2010 01 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $56,000 $1,000 Implemented
TT0046 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,696 $2,900 Implemented
TT0044 # 02 Y:2009 02 2009 REDUCE VENTILATION AIR $3,415 $0 Implemented
TT0044 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $7,850 $6,000 Implemented
TT0044 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,180 $2,000 Implemented
TT0044 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,904 $30,870 Implemented
TT0044 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $1,748 $4,000 Implemented
TT0044 # 07 Y:2009 07 2009 USE COMPRESSOR AIR FILTERS $323 $75 Implemented