Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73,765
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0133 # 16 Y:1984 | 16 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $378 | $0 | Implemented |
KU0133 # 17 Y:1984 | 17 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $365 | $144 | Implemented |
KU0133 # 18 Y:1984 | 18 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $245 | $250 | Implemented |
KU0134 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,241 | $3,991 | Implemented |
KU0134 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,694 | $3,800 | Implemented |
KU0134 # 05 Y:1984 | 05 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,505 | $986 | Implemented |
KU0134 # 07 Y:1984 | 07 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $2,701 | $0 | Implemented |
KU0134 # 15 Y:1984 | 15 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,352 | $0 | Implemented |
KU0134 # 23 Y:1984 | 23 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $395 | $250 | Implemented |
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |
KU0135 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $194 | $0 | Implemented |
KU0135 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $2,000 | Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 10 Y:1984 | 10 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,389 | $5,000 | Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |
KU0135 # 14 Y:1984 | 14 | 1984 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,763 | $3,100 | Implemented |
KU0135 # 19 Y:1984 | 19 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $905 | $300 | Implemented |
KU0135 # 22 Y:1984 | 22 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $368 | $10 | Implemented |
KU0136 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,567 | $176 | Implemented |
KU0136 # 14 Y:1984 | 14 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,003 | $215 | Implemented |
KU0136 # 15 Y:1984 | 15 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,345 | $2,500 | Implemented |
KU0136 # 16 Y:1984 | 16 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $699 | $350 | Implemented |
KU0136 # 18 Y:1984 | 18 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $589 | $550 | Implemented |
KU0136 # 19 Y:1984 | 19 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $387 | $120 | Implemented |
KU0136 # 20 Y:1984 | 20 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $219 | $400 | Implemented |