IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72,760

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0070 # 05 Y:1983 05 1983 INSTALL SET-BACK TIMERS $4,660 $14,963 Implemented
OK0070 # 06 Y:1983 06 1983 USE RADIANT HEATER FOR SPOT HEATING $3,156 $1,000 Implemented
OK0070 # 07 Y:1983 07 1983 OPTIMIZE PLANT POWER FACTOR $1,612 $2,173 Implemented
OK0073 # 02 Y:1983 02 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,050 $8,000 Implemented
OK0073 # 11 Y:1983 11 1983 HEAT WATER WITH EXHAUST HEAT $54,540 $36,000 Implemented
GT0156 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,784 $12,000 Implemented
GT0156 # 02 Y:1983 02 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $23,650 $0 Implemented
GT0156 # 05 Y:1983 05 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,395 $132,168 Implemented
GT0156 # 06 Y:1983 06 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,573 $500 Implemented
GT0156 # 07 Y:1983 07 1983 INSULATE BARE EQUIPMENT $982 $565 Implemented
GT0142 # 02 Y:1982 02 1982 MODIFY TEXTILE DRYERS $2,578 $0 Implemented
GT0142 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,895 $500 Implemented
UD0065 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $662 $200 Implemented
UD0066 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,419 $2,525 Implemented
UD0066 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $147 $0 Implemented
UD0066 # 03 Y:1982 03 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $769 $0 Implemented
UD0070 # 02 Y:1982 02 1982 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,051 $10,000 Implemented
UD0070 # 03 Y:1982 03 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $13,079 $15,000 Implemented
TN0163 # 03 Y:1982 03 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $500 $0 Implemented
TN0165 # 03 Y:1982 03 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $2,132 $200 Implemented
TN0165 # 04 Y:1982 04 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,920 $500 Implemented
OK0064 # 01 Y:1982 01 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $707 $56 Implemented
OK0064 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $400 Implemented
OK0064 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $1,405 Implemented
OK0064 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,749 $560 Implemented