IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,765

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0102 # 04 Y:1983 04 1983 INSTALL AUTOMATIC STACK DAMPER $824 $700 Implemented
KU0104 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,312 $1,500 Implemented
KU0104 # 02 Y:1983 02 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,960 $800 Implemented
KU0104 # 03 Y:1983 03 1983 REPAIR OR REPLACE STEAM TRAPS $2,673 $2,000 Implemented
KU0104 # 04 Y:1983 04 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,624 $400 Implemented
KU0104 # 05 Y:1983 05 1983 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $916 $800 Implemented
KU0104 # 06 Y:1983 06 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $9,791 $5,000 Implemented
KU0104 # 07 Y:1983 07 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,308 $132 Implemented
KU0104 # 08 Y:1983 08 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,026 Implemented
KU0105 # 04 Y:1983 04 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,827 $2,400 Implemented
KU0106 # 06 Y:1983 06 1983 USE OPTIMUM THICKNESS INSULATION $498 $100 Implemented
KU0106 # 08 Y:1983 08 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $342 $80 Implemented
UD0095 # 01 Y:1983 01 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,144 $18,000 Implemented
UD0095 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $583 $172 Implemented
UD0095 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $3,398 $2,560 Implemented
UD0090 # 03 Y:1983 03 1983 INSTALL STORM WINDOWS AND DOORS $703 $100 Implemented
UD0090 # 05 Y:1983 05 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $183 $0 Implemented
UD0091 # 06 Y:1983 06 1983 REDESIGN PROCESS $13,696 $30,000 Implemented
UD0093 # 02 Y:1983 02 1983 INSTALL STORM WINDOWS AND DOORS $12,137 $7,918 Implemented
UD0093 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,042 $5,758 Implemented
UD0093 # 04 Y:1983 04 1983 RECOVER WASTE HEAT FROM EQUIPMENT $629 $500 Implemented
UD0094 # 02 Y:1983 02 1983 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,138 $11,160 Implemented
GT0199 # 01 Y:1983 01 1983 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,320 $6,100 Implemented
GT0199 # 03 Y:1983 03 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $75 Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented