IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,761

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0141 # 01 Y:1982 01 1982 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $971 $0 Implemented
GT0141 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,559 $0 Implemented
GT0141 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $665 $50 Implemented
TN0141 # 01 Y:1982 01 1982 INSTALL TIMERS AND/OR THERMOSTATS $3,831 $350 Implemented
TN0141 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $0 Implemented
TN0141 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $113 $50 Implemented
TN0148 # 01 Y:1982 01 1982 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,200 $65,000 Implemented
TN0152 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $5,940 $0 Implemented
TN0152 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,620 $0 Implemented
OK0059 # 04 Y:1982 04 1982 LOWER CEILING TO REDUCE CONDITIONED SPACE $230 $1,137 Implemented
OK0059 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,097 $984 Implemented
OK0060 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $436 $600 Implemented
KU0066 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,340 $3,302 Implemented
KU0066 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,820 $0 Implemented
KU0066 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $957 $1,579 Implemented
KU0066 # 04 Y:1982 04 1982 INSTALL AUTOMATIC STACK DAMPER $560 $582 Implemented
KU0066 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $341 $200 Implemented
KU0067 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,254 $0 Implemented
KU0067 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $973 $139 Implemented
KU0067 # 09 Y:1982 09 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $173 $31 Implemented
UD0049 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,155 $320 Implemented
UD0049 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $773 $0 Implemented
UD0049 # 03 Y:1982 03 1982 REDUCE GLAZED AREAS IN BUILDINGS $28,537 $40,346 Implemented
UD0049 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,665 $163,485 Implemented
UD0049 # 05 Y:1982 05 1982 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,008 $7,500 Implemented