IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,681

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0513 # 05 Y:2017 05 2017 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $6,342 $27,695 Implemented
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
UF0513 # 08 Y:2017 08 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,095 $5,053 Implemented
UF0512 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $124,880 $17,000 Implemented
UF0512 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $38,189 $13,000 Implemented
UF0512 # 05 Y:2017 05 2017 USE CORRECT SIZE STEAM TRAPS $27,893 $340 Implemented
UF0512 # 06 Y:2017 06 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,845 $2,750 Implemented
UF0512 # 07 Y:2017 07 2017 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $26,348 $725 Implemented
UF0512 # 08 Y:2017 08 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,636 $6,225 Implemented
UF0512 # 09 Y:2017 09 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $4,891 $0 Implemented
UF0512 # 10 Y:2017 10 2017 INSTALL COMMON HEADER ON COMPRESSORS $3,951 $11,185 Implemented
UF0512 # 12 Y:2017 12 2017 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $280,764 $300,000 Implemented
MI0323 # 01 Y:2017 01 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,478 $51,292 Implemented
MI0323 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,440 $49,900 Implemented
MI0323 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $8,856 $2,800 Implemented
MI0323 # 06 Y:2017 06 2017 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,290 $7,150 Implemented
MI0323 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,380 $1,660 Implemented
MI0323 # 08 Y:2017 08 2017 USE SOLAR HEAT TO HEAT WATER $1,635 $1,500 Implemented
MI0322 # 01 Y:2017 01 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $1,663,200 $4,120,000 Implemented
MI0322 # 02 Y:2017 02 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $314,391 $1,004,370 Implemented
MI0322 # 03 Y:2017 03 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $171,697 $338,000 Implemented
MI0322 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,288 $72,396 Implemented
UF0511 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,447 $20,214 Implemented
UF0511 # 06 Y:2017 06 2017 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $495,807 $1,875,550 Implemented
MI0316 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,034 $39,216 Implemented