IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0850 # 10 Y:2012 10 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,348 $9,000 Implemented
WV0440 # 12 Y:2012 12 2012 INSULATE BARE EQUIPMENT $688 $599 Implemented
WV0440 # 13 Y:2012 13 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $233 $60 Implemented
WV0440 # 03 Y:2012 03 2012 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $10,500 $2,000 Implemented
WV0440 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $8,028 $823 Implemented
WV0440 # 06 Y:2012 06 2012 IMPROVE LUBRICATION PRACTICES $4,733 $3,930 Implemented
WV0440 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,442 $3,000 Implemented
WV0440 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $2,980 Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0847 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,177 $0 Implemented
UD0847 # 11 Y:2012 11 2012 REDUCE VENTILATION AIR $5,243 $0 Implemented
UD0847 # 12 Y:2012 12 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,403 $22,015 Implemented
UD0846 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,212 $2,054 Implemented
UD0846 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,567 $0 Implemented
UD0846 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $601 $1,000 Implemented
UD0846 # 08 Y:2012 08 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,712 $38,000 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0844 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,557 $0 Implemented
UD0844 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $267 $0 Implemented
UD0844 # 11 Y:2011 11 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,123 $1,000 Implemented
UD0844 # 14 Y:2011 14 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,762 $0 Implemented
UD0843 # 02 Y:2011 02 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,770 $0 Implemented