IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,761

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0224 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,796 $25 Implemented
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
LE0558 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,995 $37,000 Implemented
LE0558 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,840 $18,014 Implemented
LE0558 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,010 $1,600 Implemented
LE0558 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,863 $5,799 Implemented
LE0558 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $1,400 Implemented
UU0243 # 03 Y:2024 03 2024 COVER OPEN TANKS $9,190 $7,340 Implemented
UU0243 # 01 Y:2024 01 2024 AIR CONDITION ONLY SPACE NECESSARY $26,330 $19,500 Implemented
UU0243 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $1,900 $6,000 Implemented
UU0243 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,800 $6,300 Implemented
UF0607 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $173,293 $118,890 Implemented
UF0607 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122,669 $11,700 Implemented
UF0607 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $94,496 $322,608 Implemented
UF0607 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,683 $0 Implemented
IC0296 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $5,921 $1,066 Implemented
IC0296 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,777 $8,406 Implemented
IC0296 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,324 $400 Implemented
IC0296 # 06 Y:2024 06 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,898 $23,884 Implemented
IC0296 # 09 Y:2024 09 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,421 $0 Implemented
IC0296 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $2,446 $608 Implemented
IC0296 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,022 $1,150 Implemented
IC0296 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $7,154 $1,011 Implemented
MI0436 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,045 $0 Implemented
MI0436 # 08 Y:2023 08 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,021 $199 Implemented