IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,622

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0082 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,011 $3,340 Implemented
WM0082 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $280 Implemented
SD0524 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,124 $7,975 Implemented
SD0524 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,754 $1,310 Implemented
TT0166 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,168 $13,756 Implemented
TT0166 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $11,418 $8,000 Implemented
TT0166 # 05 Y:2016 05 2016 INSTALL SUB-METERING EQUIPMENT $11,364 $600 Implemented
TT0166 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,809 $3,000 Implemented
TT0166 # 10 Y:2016 10 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $138 $120 Implemented
MZ0204 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $3,536 $1,500 Implemented
MZ0204 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,259 $37,722 Implemented
MZ0204 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,678 $1,200 Implemented
MZ0204 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,246 $1,212 Implemented
SU0406 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,885 $0 Implemented
SU0406 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $0 Implemented
SU0406 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $644 $337 Implemented
SU0406 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $126 $145 Implemented
SU0406 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $226 $287 Implemented
SU0406 # 07 Y:2016 07 2016 REPLACE BOILER $8,344 $37,133 Implemented
SD0523 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $38,152 $147,781 Implemented
SD0523 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,463 $69,877 Implemented
SD0523 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,883 $11,174 Implemented
SD0523 # 04 Y:2016 04 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,728 $24,400 Implemented
SD0523 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,236 $1,000 Implemented
SD0523 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,188 $1,500 Implemented