IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0635 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,458 $1,000 Implemented
SD0635 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,128 $51,000 Implemented
SD0635 # 06 Y:2023 06 2023 ADJUST BURNERS FOR EFFICIENT OPERATION $10,368 $0 Implemented
SD0635 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $1,832 Implemented
SD0635 # 08 Y:2023 08 2023 REPAIR AND ELIMINATE STEAM LEAKS $5,330 $3,125 Implemented
SD0635 # 09 Y:2023 09 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,894 $3,900 Implemented
SD0634 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $942 $3,568 Implemented
SD0634 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,518 $700 Implemented
SD0634 # 03 Y:2023 03 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,222 $2,580 Implemented
SD0634 # 04 Y:2023 04 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,998 $15,050 Implemented
SD0634 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,771 $108,198 Implemented
SD0634 # 06 Y:2023 06 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,780 $11,100 Implemented
SD0634 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $585 $250 Implemented
SF0599 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,031 $15,452 Implemented
SF0599 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,633 $13,122 Implemented
SF0599 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $8,702 $0 Implemented
CI0010 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,279 $12,078 Implemented
CI0010 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,459 $115,417 Implemented
CI0010 # 06 Y:2023 06 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,125 $50 Implemented
SJ0002 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,309 $22,700 Implemented
SJ0002 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,185 $0 Implemented
SJ0002 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $424 $194 Implemented
SJ0002 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,741 $652 Implemented
SJ0002 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,772 $0 Implemented
SD0633 # 01 Y:2023 01 2023 DEVELOP A REPAIR/REPLACE POLICY $1,124 $98 Implemented