IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,526

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0174 # 02 Y:2004 02 2004 $58,500 $16,260 Implemented
SU0174 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $85 $45 Implemented
SU0174 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,102 $13,384 Implemented
SU0174 # 05 Y:2004 05 2004 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $13,639 $14,240 Implemented
SU0174 # 06 Y:2004 06 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,489 $10,360 Implemented
LE0177 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,194 $0 Implemented
LE0177 # 04 Y:2004 04 2004 USE OPTIMUM THICKNESS INSULATION $516 $585 Implemented
LE0175 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $400 Implemented
LE0174 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $16,235 $262 Implemented
LE0174 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,375 $48,722 Implemented
LE0174 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,251 $200 Implemented
LE0174 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,746 $750 Implemented
LE0174 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $3,959 $1,050 Implemented
LE0174 # 08 Y:2003 08 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,585 $0 Implemented
LE0174 # 09 Y:2003 09 2003 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $656 $0 Implemented
LE0174 # 10 Y:2003 10 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $229 $1,100 Implemented
LE0174 # 11 Y:2003 11 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $224 $80 Implemented
WV0279 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,327 $15,420 Implemented
WV0279 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,812 $20,095 Implemented
WV0279 # 03 Y:2003 03 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $11,747 $700 Implemented
WV0279 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $9,443 $2,540 Implemented
WV0279 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,685 $510 Implemented
WV0279 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $4,123 $2,300 Implemented
LE0171 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $12,638 $0 Implemented
LE0171 # 03 Y:2003 03 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,645 $6,000 Implemented