IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,882

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0116 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,138 $0 Implemented
KU0116 # 04 Y:1984 04 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,182 $100 Implemented
KU0116 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,515 $230 Implemented
KU0116 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $316 $60 Implemented
KU0117 # 04 Y:1984 04 1984 REPAIR OR REPLACE STEAM TRAPS $18,415 $4,200 Implemented
KU0117 # 08 Y:1984 08 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,541 $4,029 Implemented
KU0117 # 10 Y:1984 10 1984 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $6,170 $3,772 Implemented
KU0118 # 01 Y:1984 01 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,757 $500 Implemented
KU0118 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $883 $0 Implemented
KU0118 # 06 Y:1984 06 1984 SHUT OFF PILOTS IN STANDBY EQUIPMENT $866 $0 Implemented
KU0118 # 07 Y:1984 07 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $463 $0 Implemented
KU0118 # 11 Y:1984 11 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $519 $200 Implemented
KU0118 # 12 Y:1984 12 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $325 $0 Implemented
KU0119 # 01 Y:1984 01 1984 RECOVER WASTE HEAT FROM EQUIPMENT $21,545 $16,000 Implemented
KU0119 # 04 Y:1984 04 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,150 $3,590 Implemented
KU0119 # 07 Y:1984 07 1984 OPERATE BOILERS ON HIGH FIRE SETTING $2,034 $50 Implemented
KU0119 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,240 $0 Implemented
KU0119 # 09 Y:1984 09 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $982 $200 Implemented
KU0119 # 12 Y:1984 12 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $393 $50 Implemented
KU0119 # 14 Y:1984 14 1984 INSULATE BARE EQUIPMENT $264 $150 Implemented
KU0120 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,272 $2,159 Implemented
KU0120 # 04 Y:1984 04 1984 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $917 $0 Implemented
KU0120 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,077 $70 Implemented
KU0120 # 08 Y:1984 08 1984 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $249 $0 Implemented
KU0114 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,440 $1,100 Implemented