IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,938

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0002 # 03 Y:2001 03 2001 $2,563 $0 Implemented
TA0002 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,094 $0 Implemented
TA0002 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $225 $90 Implemented
LM0001 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $130 Implemented
LM0001 # 06 Y:2001 06 2001 $18,500 $600 Implemented
LM0001 # 07 Y:2001 07 2001 $12,500 $0 Implemented
MA0483 # 01 Y:2001 01 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $8,700 $0 Implemented
MA0483 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,650 $800 Implemented
MA0483 # 07 Y:2001 07 2001 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $570 $2,500 Implemented
MS0180 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,502 $50 Implemented
MS0180 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $162 $83 Implemented
MS0180 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $70 $88 Implemented
MS0180 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $63 $48 Implemented
LE0103 # 03 Y:2001 03 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,154 $1,600 Implemented
LE0103 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,904 $12,900 Implemented
LE0103 # 06 Y:2001 06 2001 $17,100 $12,300 Implemented
SD0270 # 01 Y:2001 01 2001 REDESIGN PROCESS $182,520 $35,000 Implemented
SD0270 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,642 $15,000 Implemented
SD0270 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,189 $800 Implemented
SD0270 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,077 $36,000 Implemented
SD0270 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,823 $103,000 Implemented
SD0270 # 07 Y:2001 07 2001 INSTALL SKYLIGHTS $7,878 $12,500 Implemented
SD0270 # 09 Y:2001 09 2001 RECOVER AND REUSE WASTE MATERIAL $32,522 $5,000 Implemented
SD0270 # 10 Y:2001 10 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $3,170 $1,500 Implemented
SD0270 # 11 Y:2001 11 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $648 $0 Implemented