IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

436

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0134 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,580 $0 Implemented
DL0134 # 08 Y:2014 08 2014 METER WASTE WATER $8,610 $8,200 Implemented
DL0132 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,480 $1,375 Implemented
DL0132 # 04 Y:2014 04 2014 INSTALL TIMERS AND/OR THERMOSTATS $11,450 $1,000 Implemented
DL0132 # 07 Y:2014 07 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,920 $1,000 Implemented
DL0132 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $860 $0 Implemented
DL0132 # 11 Y:2014 11 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $8,380 $0 Implemented
DL0132 # 12 Y:2014 12 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,320 $13,455 Implemented
DL0132 # 13 Y:2014 13 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,030 $14,000 Implemented
DL0130 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,689 $88,625 Implemented
DL0130 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $800 $200 Implemented
DL0130 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,400 $800 Implemented
DL0130 # 05 Y:2014 05 2014 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,400 $8,400 Implemented
DL0129 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $77,000 $45,150 Implemented
DL0129 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,400 $54,200 Implemented
DL0129 # 05 Y:2014 05 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,700 $3,500 Implemented
DL0129 # 07 Y:2014 07 2014 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,806 $0 Implemented
DL0129 # 08 Y:2014 08 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,600 $0 Implemented
DL0129 # 09 Y:2014 09 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $9,700 $0 Implemented
DL0128 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,000 $150,000 Implemented
DL0128 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,150 $101,600 Implemented
DL0128 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $18,200 $12,560 Implemented
DL0128 # 05 Y:2014 05 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,000 $20,000 Implemented
DL0118 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,500 $349,314 Implemented
DL0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,300 $3,000 Implemented