Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,486
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0374 # 13 Y:2009 | 13 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,217 | $4,719 | Implemented |
SF0374 # 14 Y:2009 | 14 | 2009 | INSTALL OCCUPANCY SENSORS | $701 | $1,567 | Implemented |
SF0374 # 16 Y:2009 | 16 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,002 | $318 | Implemented |
SF0374 # 17 Y:2009 | 17 | 2009 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $89,029 | $326,072 | Implemented |
SF0374 # 18 Y:2009 | 18 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $16,622 | $86,476 | Implemented |
SD0415 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,503 | $18,750 | Implemented |
SD0415 # 03 Y:2009 | 03 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,009 | $0 | Implemented |
SD0415 # 05 Y:2009 | 05 | 2009 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,035 | $128 | Implemented |
SD0415 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,000 | Implemented |
SD0415 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $154 | $347 | Implemented |
SF0373 # 01 Y:2009 | 01 | 2009 | REPAIR AND ELIMINATE STEAM LEAKS | $1,103 | $0 | Implemented |
SF0373 # 02 Y:2009 | 02 | 2009 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,700 | $3,605 | Implemented |
SF0373 # 03 Y:2009 | 03 | 2009 | INSTALL OCCUPANCY SENSORS | $1,227 | $1,320 | Implemented |
SF0373 # 04 Y:2009 | 04 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $335 | $553 | Implemented |
SF0373 # 06 Y:2009 | 06 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $402 | $906 | Implemented |
SF0373 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,543 | $12,880 | Implemented |
SF0372 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $707 | $0 | Implemented |
SD0414 # 01 Y:2009 | 01 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,200 | $14,950 | Implemented |
SD0414 # 04 Y:2009 | 04 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,637 | $1,400 | Implemented |
SD0414 # 05 Y:2009 | 05 | 2009 | INSTALL COMMON HEADER ON COMPRESSORS | $10,623 | $16,000 | Implemented |
SD0414 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,980 | $26,700 | Implemented |
SD0413 # 02 Y:2009 | 02 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $57,036 | $120,000 | Implemented |
SD0413 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $31,920 | $13,200 | Implemented |
SD0413 # 04 Y:2009 | 04 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,991 | $20,850 | Implemented |
SD0413 # 05 Y:2009 | 05 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,118 | $9,600 | Implemented |