IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74,648

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2410 # 03 Y:2024 03 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $131,806 $610,500 Implemented
UW2410 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,200 $60,000 Implemented
UW2410 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,253 $17,069 Implemented
UW2410 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $64,748 $539,875 Implemented
UW2410 # 07 Y:2024 07 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,810 $16,232 Implemented
NT0022 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,989 $2,640 Implemented
UF0618 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,157 $112,913 Implemented
UF0617 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,015 $12,416 Implemented
UF0617 # 04 Y:2024 04 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,230 $5,280 Implemented
UF0617 # 05 Y:2024 05 2024 REDUCE GLAZED AREAS IN BUILDINGS $1,046 $1,720 Implemented
UF0617 # 07 Y:2024 07 2024 AUTOMATE FINISHING PROCESS $74,880 $100,000 Implemented
UF0617 # 08 Y:2024 08 2024 IMPROVE SPACE COMFORT CONDITIONING $904 $1,752 Implemented
LT8403 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,547 $16,884 Implemented
LT8403 # 02 Y:2024 02 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,654 $95,167 Implemented
GT0978 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $46,530 $1,850 Implemented
GT0978 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $647 $390 Implemented
LE0572 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $812 $0 Implemented
LE0572 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $0 Implemented
LE0572 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,562 $4,791 Implemented
LE0572 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,224 $13,206 Implemented
LE0572 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,754 $4,000 Implemented
MZ1006 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $1,443 $750 Implemented
MZ1006 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,865 $676 Implemented
MI0443 # 02 Y:2024 02 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,162 $54,938 Implemented
MI0443 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,571 $14,916 Implemented