IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,681

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0378 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,337 $598 Implemented
UF0378 # 04 Y:2006 04 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $10,260 $2,640 Implemented
UF0378 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $4,427 $15,444 Implemented
UF0378 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,845 $12,045 Implemented
UF0378 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $3,397 $507 Implemented
MI0130 # 01 Y:2006 01 2006 REDESIGN PROCESS $7,148 $580 Implemented
MI0130 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,958 $202 Implemented
MI0130 # 03 Y:2006 03 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,791 $1,020 Implemented
MI0130 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,865 $1,074 Implemented
MI0130 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,895 $3,800 Implemented
MI0129 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,749 $400 Implemented
MI0129 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,075 $1,410 Implemented
MI0128 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,372 $31,540 Implemented
MI0128 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,703 $1,074 Implemented
MI0128 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $30 Implemented
MI0127 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,532 $33,405 Implemented
MI0127 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,597 $1,074 Implemented
MI0127 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,084 $4,800 Implemented
MI0127 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,107 $3,878 Implemented
MI0126 # 01 Y:2006 01 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,617 $16,000 Implemented
MI0126 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $8,323 $1,020 Implemented
MI0126 # 03 Y:2006 03 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,331 $212 Implemented
MI0126 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,497 $1,750 Implemented
MI0126 # 05 Y:2006 05 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,474 $0 Implemented
MI0126 # 06 Y:2006 06 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,242 $140 Implemented