Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,631
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0720 # 11 Y:2005 | 11 | 2005 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $554 | $0 | Implemented |
UD0720 # 13 Y:2005 | 13 | 2005 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $390 | $0 | Implemented |
UD0720 # 15 Y:2005 | 15 | 2005 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $200 | $340 | Implemented |
UM0280 # 03 Y:2005 | 03 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,277 | $35 | Implemented |
UM0280 # 05 Y:2005 | 05 | 2005 | INSULATE BARE EQUIPMENT | $2,086 | $128 | Implemented |
UM0280 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $1,470 | $484 | Implemented |
UM0280 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $897 | $750 | Implemented |
UM0280 # 08 Y:2005 | 08 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $654 | $225 | Implemented |
UD0718 # 03 Y:2005 | 03 | 2005 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $64,584 | $200,000 | Implemented |
UD0718 # 11 Y:2005 | 11 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,522 | $3,044 | Implemented |
UD0717 # 01 Y:2005 | 01 | 2005 | INCREASE USE OF AUTOMATION | $68,000 | $145,000 | Implemented |
UD0717 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,783 | $39,200 | Implemented |
UD0717 # 04 Y:2005 | 04 | 2005 | REPAIR OR REPLACE STEAM TRAPS | $12,702 | $5,400 | Implemented |
UD0717 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,225 | $0 | Implemented |
UD0717 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,553 | $11,448 | Implemented |
UD0717 # 09 Y:2005 | 09 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,658 | $2,526 | Implemented |
UD0716 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,047 | $65,800 | Implemented |
UD0716 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,922 | $1,440 | Implemented |
WV0315 # 01 Y:2005 | 01 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,051 | $901 | Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |
WV0315 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,495 | $2,560 | Implemented |
WV0315 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,438 | $640 | Implemented |
WV0315 # 10 Y:2005 | 10 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,126 | $20 | Implemented |
WV0315 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $140 | Implemented |