IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,486

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0095 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $93,378 $1,200 Implemented
LM0095 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,900 $2,262 Implemented
LM0095 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,871 $750 Implemented
LM0095 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $749 $100 Implemented
LM0095 # 08 Y:2005 08 2005 MODIFY STARTUP/SHUTDOWN TIMES $101,277 $1,000 Implemented
LM0095 # 09 Y:2005 09 2005 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $115,000 $3,000 Implemented
LM0095 # 10 Y:2005 10 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $23,750 $1,000 Implemented
LM0095 # 11 Y:2005 11 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $46,875 $50,000 Implemented
SD0359 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,898 $600 Implemented
SD0359 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,400 $0 Implemented
SD0359 # 05 Y:2005 05 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,599 $1,388 Implemented
SD0359 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,417 $59,829 Implemented
SD0359 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $102 $100 Implemented
SD0359 # 10 Y:2005 10 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,882 $0 Implemented
SD0358 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,194 $360 Implemented
SD0358 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $550 $1,050 Implemented
SD0358 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,023 $37,287 Implemented
SD0358 # 08 Y:2005 08 2005 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $37,125 $52,500 Implemented
LM0094 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $500 Implemented
LM0094 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2,502 $983 Implemented
LM0094 # 03 Y:2005 03 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $57,780 $50,000 Implemented
LM0093 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,607 $475 Implemented
SD0357 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $416,473 $750,000 Implemented
SD0357 # 05 Y:2005 05 2005 AUTOMATE FINISHING PROCESS $189,416 $450,000 Implemented
SD0357 # 06 Y:2005 06 2005 INSTALL SYSTEM TO COLLECT SCRAP $32,128 $29,639 Implemented