IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

465

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0237 # 05 Y:2024 05 2024 REDUCE VENTILATION AIR $1,145 $270 Implemented
DL0237 # 04 Y:2024 04 2024 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,180 $64 Implemented
DL0237 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,667 $0 Implemented
DL0237 # 06 Y:2024 06 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,985 $4,000 Implemented
DL0237 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,341 $0 Implemented
DL0237 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,998 $0 Implemented
DL0235 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $719 $0 Implemented
DL0235 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,674 $10,000 Implemented
WV0646 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $357 $407 Implemented
WV0646 # 14 Y:2023 14 2023 INSTALL OCCUPANCY SENSORS $644 $1,312 Implemented
WV0646 # 15 Y:2023 15 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $419 $909 Implemented
WV0646 # 06 Y:2023 06 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $7,758 $31,568 Implemented
WV0646 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,490 $301 Implemented
WV0646 # 12 Y:2023 12 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,904 $1,500 Implemented
WV0646 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,436 $1,807 Implemented
WV0646 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $3,094 $1,481 Implemented
WV0646 # 13 Y:2023 13 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $669 $1,895 Implemented
WV0646 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $8,960 $12,682 Implemented
DL0223 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $9,025 $0 Implemented
DL0223 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,437 $1,030 Implemented
DL0223 # 04 Y:2023 04 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $994 $4,800 Implemented
WV0642 # 14 Y:2023 14 2023 INSULATE BARE EQUIPMENT $239 $503 Implemented
WV0642 # 12 Y:2023 12 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,386 $200 Implemented
WV0642 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $2,563 $5,683 Implemented
WV0642 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $807 $970 Implemented