IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0111 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,853 $2,250 Implemented
BS0111 # 02 Y:2018 02 2018 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $768 $1,485 Implemented
BS0111 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $2,970 Implemented
BS0111 # 04 Y:2018 04 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,878 $1,225 Implemented
BS0111 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,250 $60 Implemented
BS0111 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $20 Implemented
BS0106 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $374 $275 Implemented
BS0106 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $185 $48 Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
BS0105 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78 $165 Implemented
BS0105 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $892 $1,020 Implemented
CO0536 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,530 $1,050 Implemented
CO0535 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,820 $6,420 Implemented
CO0535 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,160 $15,760 Implemented
CO0535 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,340 $750 Implemented
CO0535 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $9,690 Implemented
CO0535 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $411 $112 Implemented
UU0039 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $237 Implemented
UU0039 # 03 Y:2003 03 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,286 $1,085 Implemented
UU0039 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,754 $600 Implemented
UU0039 # 01 Y:2003 01 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,610 $9,000 Implemented
UU0039 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $199 $660 Implemented
UU0039 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $695 $695 Implemented
UU0039 # 09 Y:2003 09 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,608 $0 Implemented
CO0514 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $273 $456 Implemented