Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,719
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0788 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $126,866 | $2,500,000 | Implemented |
OR0785 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $323 | $0 | Implemented |
OR0784 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,041 | $12,113 | Implemented |
OR0782 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,455 | $3,143 | Implemented |
OR0782 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,302 | $41,745 | Implemented |
OR0781 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $618 | $2,576 | Implemented |
OR0780 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,517 | $2,000 | Implemented |
ORC010 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,690 | $0 | Implemented |
OR0776 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,131 | $6,802 | Implemented |
OR0772 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,514 | $8,385 | Implemented |
OR0772 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $1,312 | $5,390 | Implemented |
OR0772 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,740 | $3,039 | Implemented |
OR0773 # 01 Y:2023 | 01 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,439 | $1,278 | Implemented |
OR0773 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,051 | $797 | Implemented |
OR0770 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,249 | $9,000 | Implemented |
OR0770 # 01 Y:2023 | 01 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $2,142 | $6,704 | Implemented |
ORC007 # 04 Y:2023 | 04 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $808 | $50 | Implemented |
ORC007 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $3,082 | $200 | Implemented |
ORC007 # 05 Y:2023 | 05 | 2023 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,696 | $200 | Implemented |
OR0768 # 03 Y:2023 | 03 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $11,178 | $5,693 | Implemented |
OR0768 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,535 | $8,125 | Implemented |
OR0767 # 03 Y:2023 | 03 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $300,390 | $200,000 | Implemented |
OR0767 # 02 Y:2023 | 02 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $172,773 | $37,200 | Implemented |
OR0766 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,610 | $0 | Implemented |
OR0766 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,352 | $0 | Implemented |