IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,198

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0673 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $560 Implemented
WV0673 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $887 Implemented
WV0673 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $4,399 $2,317 Implemented
WV0673 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,359 $6,620 Implemented
WV0673 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,382 $16,575 Implemented
WV0673 # 12 Y:2024 12 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $179 $80 Implemented
WV0673 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $6,139 $11,569 Implemented
WV0665 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,064 $3,296 Implemented
WV0665 # 08 Y:2024 08 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,306 $1,070 Implemented
WV0665 # 05 Y:2024 05 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,272 $1,500 Implemented
WV0665 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $3,763 $2,971 Implemented
WV0665 # 09 Y:2024 09 2024 DEVELOP A REPAIR/REPLACE POLICY $2,096 $1,417 Implemented
WV0665 # 12 Y:2024 12 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,582 $375 Implemented
WV0665 # 10 Y:2024 10 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $150 Implemented
WV0659 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $2,399 $4,720 Implemented
WV0659 # 05 Y:2024 05 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,133 $19,900 Implemented
WV0659 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $603 $2,300 Implemented
WV0659 # 09 Y:2024 09 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $120 Implemented
WV0659 # 10 Y:2024 10 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $770 $2,660 Implemented
WV0659 # 06 Y:2024 06 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,611 $3,200 Implemented
WV0659 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,213 $1,440 Implemented
WV0659 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,554 $549 Implemented
WV0654 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,126 $3,800 Implemented
WV0654 # 12 Y:2023 12 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $150 Implemented
WV0654 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $190 $98 Implemented