IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,676

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0441 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $47,319 $175,000 Implemented
UF0625 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,440 $6,188 Implemented
UF0625 # 03 Y:2024 03 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,895 $5,801 Implemented
WV0676 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,979 $653 Implemented
UF0625 # 08 Y:2024 08 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $68,287 $300,000 Implemented
UF0625 # 09 Y:2024 09 2024 IMPROVE SPACE COMFORT CONDITIONING $31,920 $804 Implemented
WV0676 # 02 Y:2024 02 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,780 $5,200 Implemented
WV0676 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $49 $140 Implemented
WV0676 # 04 Y:2024 04 2024 DEVELOP A REPAIR/REPLACE POLICY $3,482 $1,197 Implemented
WV0676 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $2,075 $3,893 Implemented
UF0625 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $33,462 $12,390 Implemented
UF0625 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $710 $0 Implemented
UF0625 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,082 $469 Implemented
MS0440 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,241 $17,637 Implemented
MS0440 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,155 $0 Implemented
SU0565 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,877 $0 Implemented
SU0565 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,336 $0 Implemented
SU0565 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $1,298 $6,264 Implemented
SU0565 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,157 $7,850 Implemented
SU0565 # 02 Y:2024 02 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,793 $0 Implemented
SU0565 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $965 $54 Implemented
SU0565 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,849 $329 Implemented
SU0565 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $566 $906 Implemented
SU0564 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,442 $0 Implemented
SU0564 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $3,312 $118 Implemented