IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0240 # 01 Y:2024 01 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $12,775 $0 Implemented
DL0240 # 02 Y:2024 02 2024 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $9,910 $0 Implemented
DL0240 # 03 Y:2024 03 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $40,323 $0 Implemented
DL0240 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,194 $3,716 Implemented
DL0240 # 05 Y:2024 05 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,202 $14,500 Implemented
DL0240 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $49,476 $225,000 Implemented
MI0440 # 08 Y:2024 08 2024 UPGRADE CONTROLS ON COMPRESSORS $8,533 $42,540 Implemented
MI0440 # 09 Y:2024 09 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,423 $279 Implemented
MI0440 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $21,169 $1,320 Implemented
MI0440 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,986 $1,980 Implemented
MI0440 # 05 Y:2024 05 2024 AIR CONDITION ONLY SPACE NECESSARY $18,769 $74,097 Implemented
MI0440 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,242 $860 Implemented
MI0440 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,491 $1,720 Implemented
WV0659 # 06 Y:2024 06 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,611 $3,200 Implemented
WV0659 # 05 Y:2024 05 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,133 $19,900 Implemented
WV0659 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $2,399 $4,720 Implemented
WV0659 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,554 $549 Implemented
WV0659 # 09 Y:2024 09 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $120 Implemented
WV0659 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $603 $2,300 Implemented
WV0659 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,213 $1,440 Implemented
WV0659 # 10 Y:2024 10 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $770 $2,660 Implemented
WV0658 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $12,543 $934 Implemented
WV0658 # 01 Y:2024 01 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $46,042 $4,000 Implemented
WV0658 # 09 Y:2024 09 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,325 $952 Implemented
WV0658 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,056 $7,004 Implemented