IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0565 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,696 $15,450 Implemented
OK0565 # 04 Y:1999 04 1999 $49,521 $3,600 Implemented
TN0651 # 02 Y:1999 02 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $9,040 $9,140 Implemented
TN0651 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $3,020 $1,605 Implemented
AS0243 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $7,800 $80 Implemented
AM0341 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,300 $500 Implemented
AM0341 # 02 Y:1999 02 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,600 $500 Implemented
AM0341 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,760 $18,630 Implemented
AM0341 # 04 Y:1999 04 1999 REPAIR AND ELIMINATE STEAM LEAKS $6,140 $780 Implemented
AM0341 # 05 Y:1999 05 1999 USE SYNTHETIC LUBRICANT $3,380 $0 Implemented
AM0341 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $540 $905 Implemented
AM0341 # 09 Y:1999 09 1999 USE SYNTHETIC LUBRICANT $415 $0 Implemented
AS0242 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $297 $398 Implemented
AS0242 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $526 $551 Implemented
AS0242 # 05 Y:1999 05 1999 USE OPTIMUM THICKNESS INSULATION $3,847 $383 Implemented
AS0242 # 10 Y:1999 10 1999 $56,000 $36,200 Implemented
MA0432 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,201 $18,690 Implemented
MA0432 # 03 Y:1999 03 1999 USE RADIANT HEATER FOR SPOT HEATING $6,592 $40,000 Implemented
MA0432 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $0 Implemented
MA0432 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $703 $1,451 Implemented
MA0432 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $681 $0 Implemented
MA0432 # 08 Y:1999 08 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $428 $200 Implemented
MA0432 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $30 Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented