IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,100

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0367 # 05 Y:2000 05 2000 $505 $290 Implemented
AM0367 # 06 Y:2000 06 2000 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $355 $0 Implemented
AM0367 # 07 Y:2000 07 2000 $234 $0 Implemented
AM0367 # 08 Y:2000 08 2000 USE SYNTHETIC LUBRICANT $130 $0 Implemented
UM0157 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,161 $150 Implemented
UM0157 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $746 $500 Implemented
UM0157 # 03 Y:2000 03 2000 REDUCE EXCESSIVE BOILER BLOWDOWN $1,224 $4,430 Implemented
UM0157 # 05 Y:2000 05 2000 $1,296 $738 Implemented
WI0365 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,830 $26,500 Implemented
WI0365 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,131 $5,808 Implemented
WI0365 # 05 Y:2000 05 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 Implemented
WI0365 # 06 Y:2000 06 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,168 $7,500 Implemented
WI0365 # 07 Y:2000 07 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,922 $600 Implemented
GT0683 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,364 $11,500 Implemented
GT0683 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,190 $1,000 Implemented
AS0270 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,324 $6,008 Implemented
AS0270 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $1,608 $200 Implemented
AS0270 # 07 Y:2000 07 2000 $269,180 $100,000 Implemented
ME0283 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,561 $500 Implemented
ME0283 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,294 $300 Implemented
WV0182 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,539 $60 Implemented
WV0182 # 02 Y:2000 02 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,677 $175 Implemented
WV0182 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $70 Implemented
WV0182 # 05 Y:2000 05 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $1,009 $1,458 Implemented
WV0182 # 10 Y:2000 10 2000 $20,000 $7,000 Implemented