IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,622

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0405 # 10 Y:2016 10 2016 ELIMINATE/REDUCE AN OPERATION $607 $1,364 Implemented
AM0699 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,480 $4,000 Implemented
AM0699 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $4,095 $0 Implemented
AM0699 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,015 $240 Implemented
BD0476 # 02 Y:2016 02 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,201 $1,400 Implemented
UD0940 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,751 $0 Implemented
UD0940 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,203 $0 Implemented
UD0940 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,308 $0 Implemented
UD0940 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,717 $1,500 Implemented
UD0940 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,111 $29 Implemented
UD0940 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $920 $1,000 Implemented
UD0940 # 12 Y:2016 12 2016 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,892 $5,000 Implemented
MI0290 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $81,253 $1,120 Implemented
MI0290 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $50,831 $40 Implemented
MI0290 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,730 $16,200 Implemented
MI0290 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $3,248 $2,165 Implemented
MI0290 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,622 $40 Implemented
MI0290 # 10 Y:2016 10 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,792 $280 Implemented
MI0290 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $1,080 Implemented
MI0290 # 14 Y:2016 14 2016 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $396 $317 Implemented
TT0165 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,405 $88,306 Implemented
TT0165 # 03 Y:2016 03 2016 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $4,033 $3,600 Implemented
TT0165 # 04 Y:2016 04 2016 OPERATE BOILERS ON HIGH FIRE SETTING $4,000 $12,000 Implemented
TT0165 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $2,310 $1,919 Implemented
TT0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $883 $1,500 Implemented