IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,506

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0242 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,658 $13,800 n/a
UU0242 # 05 Y:2024 05 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,004 $11,422 n/a
UU0242 # 02 Y:2024 02 2024 CLOSE OFF UNNEEDED STEAM LINES $10,220 $4,400 n/a
UU0242 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $21,730 $82,100 n/a
UU0245 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $13,514 $18,000 n/a
UU0245 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,961 $3,200 n/a
UU0245 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $299 $100 n/a
UU0245 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,693 $25,330 n/a
UU0244 # 04 Y:2024 04 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $307 $460 n/a
UU0244 # 03 Y:2024 03 2024 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $370 $264 n/a
UU0244 # 02 Y:2024 02 2024 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $3,681 $3,450 n/a
UU0244 # 01 Y:2024 01 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,850 $2,400 n/a
UU0243 # 01 Y:2024 01 2024 AIR CONDITION ONLY SPACE NECESSARY $26,330 $19,500 n/a
UU0243 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,800 $6,300 n/a
UU0243 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $1,900 $6,000 n/a
UU0243 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,631 $22,338 n/a
UU0243 # 02 Y:2024 02 2024 USE POWER DURING OFF-PEAK PERIODS $15,800 $13,000 n/a
UU0243 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,244 $14,145 n/a
UU0243 # 03 Y:2024 03 2024 COVER OPEN TANKS $9,190 $7,340 n/a
UU0240 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $1,387 n/a
UU0240 # 01 Y:2024 01 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,047 $10,320 n/a
UU0240 # 02 Y:2024 02 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $1,601 $7,755 n/a
UU0240 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,286 $1,500 n/a
UU0240 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $977 $113 n/a
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 n/a