IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0260 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,557 $6,277 n/a
UU0260 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,696 $8,277 n/a
UU0260 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,585 $5,800 n/a
UU0260 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $27,825 $247,680 n/a
UU0260 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $726 $3,000 n/a
UU0260 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $489 $1,818 n/a
UU0261 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $22,296 $572,100 n/a
UU0261 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $9,140 n/a
UU0261 # 03 Y:2024 03 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $12,100 $21,600 n/a
UU0261 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,386 $8,280 n/a
UU0258 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $25,800 $6,200 n/a
UU0258 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,890 $11,500 n/a
UU0258 # 03 Y:2024 03 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $12,600 $54,500 n/a
UU0258 # 06 Y:2024 06 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,570 $5,140 n/a
UU0261 # 02 Y:2024 02 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,592 $37,200 n/a
UU0258 # 01 Y:2024 01 2024 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $158,000 $725,000 n/a
UU0261 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $400 $5,940 n/a
UU0258 # 08 Y:2024 08 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $180,000 $20,000 n/a
UU0258 # 04 Y:2024 04 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,690,000 $23,500,000 n/a
UU0258 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $120,000 $198,000 n/a
UU0259 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $221,450 $2,473,450 n/a
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 n/a
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 n/a
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 n/a
UU0259 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,866,540 $17,885,484 n/a