IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,582

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0218 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $512 $161 Implemented
UU0217 # 01 Y:2023 01 2023 Install Anaerobic Digester $648,030 $7,400,000 Implemented
UU0217 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,500 $51,330 Implemented
UU0217 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,807 $8,910 Implemented
UU0217 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,013 $1,020 Implemented
UU0217 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,794 $5,550 Not Implemented
UU0216 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $40,810 $55,030 Not Implemented
UU0216 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $33,351 $454,189 Not Implemented
UU0216 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $28,144 $4,000 Not Implemented
UU0216 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,370 $31,280 Not Implemented
UU0216 # 05 Y:2023 05 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,644 $500 Not Implemented
UU0216 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,031 $2,025 Not Implemented
UU0215 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,760 $120,564 Not Implemented
UU0215 # 02 Y:2023 02 2023 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,878 $48,510 Implemented
UU0215 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,368 $27,177 Implemented
UU0215 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,775 $52,882 Implemented
UU0215 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $3,212 $5,850 Implemented
UU0215 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,565 $1,563 Implemented
UU0215 # 07 Y:2023 07 2023 REDESIGN PROCESS $913 $2,360 Implemented
UU0215 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $228 $1,725 Implemented
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
UU0214 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,069 $17,638 Implemented
UU0214 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,776 $6,969 Implemented
UU0214 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,274 $495 Implemented
UU0214 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $701 $1,150 Not Implemented