Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,582
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0218 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $512 | $161 | Implemented |
UU0217 # 01 Y:2023 | 01 | 2023 | Install Anaerobic Digester | $648,030 | $7,400,000 | Implemented |
UU0217 # 02 Y:2023 | 02 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,500 | $51,330 | Implemented |
UU0217 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,807 | $8,910 | Implemented |
UU0217 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,013 | $1,020 | Implemented |
UU0217 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,794 | $5,550 | Not Implemented |
UU0216 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $40,810 | $55,030 | Not Implemented |
UU0216 # 02 Y:2023 | 02 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,351 | $454,189 | Not Implemented |
UU0216 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,144 | $4,000 | Not Implemented |
UU0216 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,370 | $31,280 | Not Implemented |
UU0216 # 05 Y:2023 | 05 | 2023 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $5,644 | $500 | Not Implemented |
UU0216 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,031 | $2,025 | Not Implemented |
UU0215 # 01 Y:2023 | 01 | 2023 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $13,760 | $120,564 | Not Implemented |
UU0215 # 02 Y:2023 | 02 | 2023 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,878 | $48,510 | Implemented |
UU0215 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,368 | $27,177 | Implemented |
UU0215 # 04 Y:2023 | 04 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,775 | $52,882 | Implemented |
UU0215 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,212 | $5,850 | Implemented |
UU0215 # 06 Y:2023 | 06 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,565 | $1,563 | Implemented |
UU0215 # 07 Y:2023 | 07 | 2023 | REDESIGN PROCESS | $913 | $2,360 | Implemented |
UU0215 # 08 Y:2023 | 08 | 2023 | INSULATE BARE EQUIPMENT | $228 | $1,725 | Implemented |
UU0214 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,031 | $23,302 | Implemented |
UU0214 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,069 | $17,638 | Implemented |
UU0214 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,776 | $6,969 | Implemented |
UU0214 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,274 | $495 | Implemented |
UU0214 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $701 | $1,150 | Not Implemented |