Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0023 # 08 Y:2001 | 08 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $14,413 | $72,000 | n/a |
GT0723 # 01 Y:2001 | 01 | 2001 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $21,103 | $60,000 | Implemented |
GT0723 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,140 | $68,913 | Implemented |
GT0723 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,660 | $825 | Implemented |
GT0723 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,036 | $350 | Implemented |
GT0723 # 05 Y:2001 | 05 | 2001 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $76,655 | $0 | Implemented |
GT0723 # 06 Y:2001 | 06 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,965 | $1,418 | Implemented |
MA0501 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,983 | $6,000 | Implemented |
MA0501 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,653 | $46,540 | Implemented |
MA0501 # 03 Y:2001 | 03 | 2001 | OPTIMIZE PLANT POWER FACTOR | $5,838 | $9,990 | Implemented |
MA0501 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $4,410 | $2,500 | Implemented |
MA0501 # 05 Y:2001 | 05 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,219 | $2,162 | Not Implemented |
MA0501 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $736 | $300 | Implemented |
MA0501 # 07 Y:2001 | 07 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $264 | $0 | Implemented |
CO0495 # 01 Y:2001 | 01 | 2001 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,590 | $17,000 | Implemented |
CO0495 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $1,860 | $500 | Implemented |
CO0495 # 03 Y:2001 | 03 | 2001 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $470 | $500 | Implemented |
CO0495 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $250 | $0 | Implemented |
CO0495 # 05 Y:2001 | 05 | 2001 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $9,900 | $1,000 | Implemented |
OR0403 # 01 Y:2001 | 01 | 2001 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $20,460 | $860 | Implemented |
OR0403 # 02 Y:2001 | 02 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $18,830 | $27,000 | Not Implemented |
OR0403 # 03 Y:2001 | 03 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,010 | $0 | Implemented |
OR0403 # 04 Y:2001 | 04 | 2001 | ADD AREA LIGHTING SWITCHES | $645 | $1,400 | Not Implemented |
OR0404 # 01 Y:2001 | 01 | 2001 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $25,650 | $0 | Implemented |
OR0404 # 02 Y:2001 | 02 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,457 | $1,102 | Implemented |